A new efficient energy from waste solution at Baldovie, Dundee

Making more use of the energy in Dundee and Angus’s residual waste

Having signed a long term contract with Dundee City and Angus Councils, MVV are responsible for using the Councils’ residual waste (that is waste which is left over after recycling) to generate electrical power in the existing facility at Baldovie. At the same time, we are building a new, state of the art, Energy from Waste Combined Heat and Power Facility directly adjacent to the existing facility. This new development will use around 110,000 tonnes of waste per year to generate electricity as well as steam for the local industry in a highly efficient process called Combined Heat and Power (CHP). This makes best use of the energy stored in the waste and reduces significantly local emissions of greenhouse gases and other pollutants.

Planning permission was granted by Dundee City Council on 24th March 2017. Currently we are in the process of achieving an Environmental Permit from the Scottish Environmental Protection Agency (SEPA). Construction is planned to begin in 2018, with the finished plant being commissioned in 2020.

For further information, please see our Frequently Asked Questions. The boards that were shown in the second of our two pre-application public consultations are available here .

back to top

Our Office:

MVV Environment
Baldovie EfW CHP Facility
Forties Road
Dundee
DD4 0NS

General Enquiries:

+44 1382 483 603

Community Liaison Manager:

+44 7966 216 041

Contact
Foto von Paul  Carey

Paul Carey

Managing Director MVV Environment

T

+44 7768 842 715

Save Contact as VCFsichern

All fields marked with * are required.